SGS: Tailored fume cabinet refurbishment project
By following the FC2 refurbishment process to increase efficiency, SGS could see huge savings anywhere up to $140,000 per annum.
Schlumberger: Remedial repairs for two campaigns in a record timeframe
Schlumberger required our team’s experience and expertise to complete these inspections and ensure all equipment met safety and compliance requirements.
Orthocell: A smart air filter solution resulting in big savings
A quick, easy and stress-free solution with no additional upfront cost, since the current filters would need to be replaced either way.
Plas Pak: How we helped the plastic manufacturer increase production by 70%
“We used to produce between 600 and 700 thousand of bottles per month. Now we produce more than a million during the same period”
Outback Jacks Northbridge: Hydrocarbon vs R22
The goal is to reduce the overall energy consumption by up to 20% when running on an M50 drop-in replacement refrigerant in the Outback Jacks Northbridge cool room. Plant monitoring equipment was installed on the refrigeration system for 8 weeks to record all operational data and power consumption, being 7 weeks using the regular R22 and the last week using M50.
Grace Loves Lace: Heritage Building Air Distribution Solution
Due to the location and nature of the business, the Engixo team had the challenge to design an air conditioning system that was both effective, easy to install and seamless to not interfere much in the showroom design or in the heritage-listed building architecture.
GenesisCare: Chiller Plant re-Design
GenesisCare - Wembley uses MRI machines for diagnosis and for radiation treatment for patients with cancer. In order to keep these machines in a good working condition, two chillers were previously installed to keep the machines at a controlled temperature during its usage and avoid overheating.
No items found.
SGS: Tailored fume cabinet refurbishment project
By following the FC2 refurbishment process to increase efficiency, SGS could see huge savings anywhere up to $140,000 per annum.
Schlumberger: Remedial repairs for two campaigns in a record timeframe
Schlumberger required our team’s experience and expertise to complete these inspections and ensure all equipment met safety and compliance requirements.
Orthocell: A smart air filter solution resulting in big savings
A quick, easy and stress-free solution with no additional upfront cost, since the current filters would need to be replaced either way.
Plas Pak: How we helped the plastic manufacturer increase production by 70%
“We used to produce between 600 and 700 thousand of bottles per month. Now we produce more than a million during the same period”
Outback Jacks Northbridge: Hydrocarbon vs R22
The goal is to reduce the overall energy consumption by up to 20% when running on an M50 drop-in replacement refrigerant in the Outback Jacks Northbridge cool room. Plant monitoring equipment was installed on the refrigeration system for 8 weeks to record all operational data and power consumption, being 7 weeks using the regular R22 and the last week using M50.
Grace Loves Lace: Heritage Building Air Distribution Solution
Due to the location and nature of the business, the Engixo team had the challenge to design an air conditioning system that was both effective, easy to install and seamless to not interfere much in the showroom design or in the heritage-listed building architecture.
GenesisCare: Chiller Plant re-Design
GenesisCare - Wembley uses MRI machines for diagnosis and for radiation treatment for patients with cancer. In order to keep these machines in a good working condition, two chillers were previously installed to keep the machines at a controlled temperature during its usage and avoid overheating.